Prewitt Industrial Cluster Site #1

Industrial

McKinley County, New Mexico · SPP

DC Readiness
42.7
Fair / 100

Prewitt Industrial Cluster Site #1 is a industrial datacenter candidate site in McKinley County, New Mexico, interconnecting through SPP. It screens at 42.7/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth24

Connectivity

Nearest IXPOso Grande Technologies
IXP distance82.6 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterOso Grande
DC distance82.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.77¢/kWh
Industrial electricity16.87¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$605

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
47
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in McKinley County, ranked by DC Readiness.

Sites near Prewitt Industrial Cluster Site #1
SiteTypeVoltageCapacityQueue waitScore
PRUITT ESCALANTE (PEGS)Substation-Adjacent230 kV300 MW3.5 yrs67.1
MCKINLEYSubstation-Adjacent345 kV600 MW3.5 yrs65.5
AMBROSIASubstation-Adjacent230 kV300 MW3.5 yrs61.4
SEVEN LAKESSubstation-Adjacent230 kV300 MW3.5 yrs60.8
Greenfield (MCKINLEY - SPRINGERVILLE)Greenfield345 kV600 MW3.5 yrs60.3
UNKNOWN303765Substation-Adjacent115 kV100 MW3.5 yrs59.7
CINIZASubstation-Adjacent115 kV100 MW3.5 yrs58.9
Greenfield (SAN JUAN - MCKINLEY)Greenfield345 kV600 MW3.5 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Prewitt Industrial Cluster Site #1, McKinley County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.