Loving County, New Mexico · SPP

DC Readiness
50.6
Fair / 100

OCHOA is a substation-adjacent datacenter candidate site in Loving County, New Mexico, interconnecting through SPP. It screens at 50.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationOCHOA
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityLEA COUNTY ELECTRIC COOP, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth34
Avg queue wait3.3 yrs

Connectivity

Fiber providers1
Fiber coverage8.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterDatacenter 1536086684
DC distance48.3 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.21¢/kWh
Industrial electricity4.87¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,671

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OCHOA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
59
Fiber connectivity12%
40
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Loving County, ranked by DC Readiness.

Sites near OCHOA
SiteTypeVoltageCapacityQueue waitScore
OZ LovingGreenfield——3.4 yrs53.6
LOVINGSubstation-Adjacent138 kV100 MW1.7 yrs53.3
Greenfield (KIOWA SUBSTATION - ROADRUNNER)Greenfield345 kV600 MW6.9 yrs51.1
Greenfield (PHANTOM - ROADRUNNER)Greenfield345 kV600 MW6.9 yrs50.7
Greenfield (CHINA DRAW - PHANTOM)Greenfield345 kV600 MW3.3 yrs50.7
Greenfield (CHINA DRAW - PHANTOM)Greenfield345 kV600 MW3.3 yrs50.6
Greenfield (PHANTOM - ROADRUNNER)Greenfield345 kV600 MW6.9 yrs50.5
Greenfield (PHANTOM - ROADRUNNER)Greenfield345 kV600 MW6.9 yrs50.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OCHOA, Loving County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.