Lincoln County, New Mexico · SPP

DC Readiness
45.6
Fair / 100

CAPITAN is a substation-adjacent datacenter candidate site in Lincoln County, New Mexico, interconnecting through SPP. It screens at 45.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCAPITAN
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityOTERO COUNTY ELECTRIC COOP INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth32
Avg queue wait3.3 yrs

Connectivity

Nearest IXPSouthwest Cyberport Albuquerque
IXP distance122.4 mi
Fiber providers5
Fiber coverage49.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterInformation Systems Facility
DC distance95.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.99¢/kWh
Industrial electricity6.87¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$915

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track CAPITAN

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
36
Fiber connectivity12%
51
Energy cost10%
50
Water risk7%
20
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Lincoln County, ranked by DC Readiness.

Sites near CAPITAN
SiteTypeVoltageCapacityQueue waitScore
EC FFE Lincoln CountyGreenfield——3.5 yrs50.7
UNKNOWN309026Substation-Adjacent115 kV100 MW3.3 yrs47.4
UNKNOWN300062Substation-Adjacent138 kV100 MW3.3 yrs45.4
HOLLYWOODSubstation-Adjacent115 kV100 MW3.3 yrs45.0
GLENCOESubstation-Adjacent69 kV50 MW3.3 yrs43.0
Mine SiteFormer Mine——3.3 yrs43.0
Mine SiteFormer Mine——3.3 yrs43.0
UNKNOWN303754Substation-Adjacent69 kV50 MW3.3 yrs43.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for CAPITAN, Lincoln County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.