Substation-Adjacent site at 32.784, -103.488

Substation-Adjacent

Lea County, New Mexico · SPP

DC Readiness
50.4
Fair / 100

At a glance

Substation-Adjacent site at 32.784, -103.488 is a substation-adjacent datacenter candidate site in Lea County, New Mexico, scoring 50.4/100 DC Readiness — 59th of 69 scored sites in the county. Its nearest substation is TAP302471 (0 mi, 69 kV). It sits in the SPP grid region and the LEA COUNTY ELECTRIC COOP, INC service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationTAP302471
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityLEA COUNTY ELECTRIC COOP, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth32
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Fiber providers6
Fiber coverage80.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterDatacenter 1536086684
DC distance87.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity9.93¢/kWh
Industrial electricity6.63¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$979

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP302471

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 32.784, -103.488 compare with other sites in Lea County?

Substation-Adjacent site at 32.784, -103.488 ranks 59th of 69 scored candidate sites in Lea County. Its 50.4/100 is roughly in line with the county average of 52.9. It is roughly in line with the New Mexico average of 47.8 and roughly in line with the national average of 53.2.

Against the New Mexico average, its strongest sub-score is fiber connectivity (66 vs 52) and its weakest is water (20 vs 23). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 32.784, -103.488 to power, fiber and other datacenters?

The nearest mapped substation, TAP302471, is about 0 miles away and operates at 69 kV. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 1536086684, 87.8 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 32.784, -103.488?

At the county level, FEMA's National Risk Index rates Lea County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
54
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
20
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Lea County, ranked by DC Readiness.

Sites near Substation-Adjacent site at 32.784, -103.488
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN302202Substation-Adjacent230 kV300 MW4.3 yrs57.3
UNKNOWN310045Substation-Adjacent230 kV300 MW4.3 yrs57.3
EC Near CunninghamGreenfield——4.3 yrs57.1
EC Near CunninghamGreenfield——4.3 yrs57.0
EC Near CunninghamGreenfield——4.3 yrs56.8
EC Near CunninghamGreenfield——4.3 yrs56.8
EC Near CunninghamGreenfield——4.3 yrs56.5
EC Near CunninghamGreenfield——4.3 yrs56.5

Substation-Adjacent site at 32.784, -103.488: common questions

What is the DC Readiness score of Substation-Adjacent site at 32.784, -103.488?

Substation-Adjacent site at 32.784, -103.488 scores 50.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 59th of 69 scored sites in Lea County. The Lea County average is 52.9 and the New Mexico average is 47.8.

What is the nearest substation to Substation-Adjacent site at 32.784, -103.488?

The nearest mapped substation is TAP302471, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 32.784, -103.488?

LEA COUNTY ELECTRIC COOP, INC (cooperative) holds the retail service territory that contains the site.

What grid region is Substation-Adjacent site at 32.784, -103.488 in?

Substation-Adjacent site at 32.784, -103.488 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 32.784, -103.488, Lea County, NM”, https://gridcensus.com/datacenter-sites/new-mexico/lea-county/tap302471-d4166f40 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 32.784, -103.488, Lea County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.