BRAVO DOME WEST

Substation-Adjacent

Harding County, New Mexico · SPP

DC Readiness
46.4
Fair / 100

BRAVO DOME WEST is a substation-adjacent datacenter candidate site in Harding County, New Mexico, interconnecting through SPP. It screens at 46.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBRAVO DOME WEST
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityFARMERS ELECTRIC COOP, INC - (NM)cooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth32
Avg queue wait3.3 yrs

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance116.8 mi
Fiber providers1
Fiber coverage86.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterAmarillo Petroleum Building
DC distance116.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity14.02¢/kWh
Industrial electricity7.70¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$447

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Get alerts

Track BRAVO DOME WEST

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
36
Fiber connectivity12%
41
Energy cost10%
50
Water risk7%
20
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Harding County, ranked by DC Readiness.

Sites near BRAVO DOME WEST
SiteTypeVoltageCapacityQueue waitScore
EC FFE Harding CountyGreenfield——3.5 yrs51.5
BRAVO DOMESubstation-Adjacent115 kV100 MW3.3 yrs48.4
ROYSubstation-Adjacent69 kV50 MW3.3 yrs44.4
Mine SiteFormer Mine——3.3 yrs43.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for BRAVO DOME WEST, Harding County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.