TYRONE (PHELPS DODGE)

Substation-Adjacent

Grant, New Mexico · WECC

DC Readiness
49.1
Fair / 100

At a glance

TYRONE (PHELPS DODGE) is a substation-adjacent datacenter candidate site in Grant, New Mexico, scoring 49.1/100 DC Readiness — 26th of 72 scored sites in the county. Its nearest substation is TYRONE (PHELPS DODGE) (0 mi, 115 kV). It sits in the WECC grid region and the PUBLIC SERVICE CO OF NM service territory, where interconnection has averaged 3.5 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationTYRONE (PHELPS DODGE)
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityPUBLIC SERVICE CO OF NMinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth32
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPMDC El Paso
IXP distance136.5 mi
Fiber providers3
Fiber coverage3.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterCenturyLink DC
DC distance99.4 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity11.94¢/kWh
Industrial electricity6.15¢/kWh
Cooling degree days1,400
Heating degree days4,000
Land price / acre$575

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TYRONE (PHELPS DODGE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does TYRONE (PHELPS DODGE) compare with other sites in Grant?

TYRONE (PHELPS DODGE) ranks 26th of 72 scored candidate sites in Grant. Its 49.1/100 is roughly in line with the county average of 46.9. It is roughly in line with the New Mexico average of 47.8 and roughly in line with the national average of 53.2.

Against the New Mexico average, its strongest sub-score is power availability (56 vs 38) and its weakest is fiber connectivity (46 vs 52). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is TYRONE (PHELPS DODGE) to power, fiber and other datacenters?

The nearest mapped substation, TYRONE (PHELPS DODGE), is about 0 miles away and operates at 115 kV. For connectivity, the nearest internet exchange facility is MDC El Paso at 136.5 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is CenturyLink DC, 99.4 miles away.

What are the flood, water and hazard risks at TYRONE (PHELPS DODGE)?

At the county level, FEMA's National Risk Index rates Grant "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
50
Fiber connectivity12%
46
Energy cost10%
50
Water risk7%
20
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
55

Nearby comparable sites

Other scored datacenter candidate sites in Grant, ranked by DC Readiness.

Sites near TYRONE (PHELPS DODGE)
SiteTypeVoltageCapacityQueue waitScore
HIDALGOSubstation-Adjacent345 kV600 MW3.5 yrs55.4
EC Near Chino MinesGreenfield——3.5 yrs54.1
EC Near Chino MinesGreenfield——3.5 yrs53.8
EC Near Chino MinesGreenfield——3.5 yrs53.4
EC Near Chino MinesGreenfield——3.5 yrs53.2
EC Near Freeport McMoRanGreenfield——3.5 yrs53.1
EC Near Freeport McMoRanGreenfield——3.5 yrs53.0
EC Near Chino MinesGreenfield——3.5 yrs53.0

TYRONE (PHELPS DODGE): common questions

What is the DC Readiness score of TYRONE (PHELPS DODGE)?

TYRONE (PHELPS DODGE) scores 49.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 26th of 72 scored sites in Grant. The Grant average is 46.9 and the New Mexico average is 47.8.

What is the nearest substation to TYRONE (PHELPS DODGE)?

The nearest mapped substation is TYRONE (PHELPS DODGE), about 0 miles away, at 115 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves TYRONE (PHELPS DODGE)?

PUBLIC SERVICE CO OF NM (investor owned) holds the retail service territory that contains the site; its holding company is PUBLIC SERVICE COMPANY OF NEW MEXICO RESOURCES.

What grid region is TYRONE (PHELPS DODGE) in?

TYRONE (PHELPS DODGE) is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is TYRONE (PHELPS DODGE) from an internet exchange?

The nearest internet exchange facility is MDC El Paso, about 136.5 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TYRONE (PHELPS DODGE), Grant, NM”, https://gridcensus.com/datacenter-sites/new-mexico/grant/tyrone-phelps-dodge-bde95ef5 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for TYRONE (PHELPS DODGE), Grant is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.