Pyrolac Site

Industrial

Passaic County, New Jersey · PJM

DC Readiness
54.5
Fair / 100

Pyrolac Site is an industrial datacenter candidate site in Passaic County, New Jersey, interconnecting through PJM. It screens at 54.5/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityPUBLIC SERVICE ELEC & GAS COinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth222
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCyrusOne Totowa
IXP distance5.4 mi
Fiber providers10
Fiber coverage99.8%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterCyrusOne Totowa
DC distance5.4 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.81¢/kWh
Industrial electricity8.04¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$43,712

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Pyrolac Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
32
Fiber connectivity12%
96
Energy cost10%
50
Water risk7%
84
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Passaic County, ranked by DC Readiness.

Sites near Pyrolac Site
SiteTypeVoltageCapacityQueue waitScore
Dr Hani Awadallah School (GSHP)Brownfield——3.8 yrs66.6
ITT Marlow (GSHP)Brownfield——3.8 yrs66.3
OZ PassaicGreenfield——2.6 yrs65.7
MONTVILLESubstation-Adjacent230 kV300 MW3.8 yrs64.9
UNKNOWN132389Substation-Adjacent230 kV300 MW3.8 yrs64.7
OZ PassaicGreenfield——2.6 yrs63.8
OZ PassaicGreenfield——2.6 yrs63.5
Block 115, Lot 4Industrial——3.8 yrs55.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Pyrolac Site, Passaic County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.