Carlstadt Scientific Chemical Processing , Inc.

Brownfield

Bergen County, New Jersey · PJM

DC Readiness
64.8
Good / 100

Carlstadt Scientific Chemical Processing , Inc. is a brownfield datacenter candidate site in Bergen County, New Jersey, interconnecting through PJM. It screens at 64.8/100 DC Readiness with a catalogued 2 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCARLSTADT
Substation distance0.4 mi
Available capacity2 MW
LMP zonePJM_PSEG
Wholesale LMP$42.30/MWh
Utility commercial rate0.10¢/kWh
UtilityPUBLIC SERVICE ELEC & GAS COinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth222
Avg queue wait3.8 yrs

Connectivity

Nearest IXP365 Data Centers Carlstadt (NJ3)
IXP distance0.7 mi
Fiber providers14
Fiber coverage100.0%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance219.3 mi

Site characteristics

Site typeBrownfield
Acreage6 ac
Buildable load (est.)~2–6 MWland-based· grid headroom is tighter
Land owner typeprivate
Buildability75.0/100
Former usesuperfund
Existing capacity2 MW
Cleanup statuscleanup_complete

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCONSOLIDATED GRAPHICS MATERIALS
Hazard sub-score62/100
Construction cost index110.5 (avg 100)

Location context

Nearest datacenterSungard AS Carlstadt 777
DC distance0.9 mi
Nearest rail0.6 mi
Nearest gas pipeline0.8 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.88¢/kWh
Industrial electricity7.95¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$188,137

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Carlstadt Scientific Chemical Processing , Inc.

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
48
Speed to power20%
39
Fiber connectivity12%
76
Energy cost10%
85
Water risk7%
89
Natural hazard6%
62
Buildability7%
75
Labor market4%
50
DC cluster4%
100
Land / acreage3%
41
Construction cost3%
58
Gas pipeline2%
97
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Bergen County, ranked by DC Readiness.

Sites near Carlstadt Scientific Chemical Processing , Inc.
SiteTypeVoltageCapacityQueue waitScore
Hackensack Solar FarmBrownfield230 kV1 MW3.8 yrs66.8
WALDWICKSubstation-Adjacent345 kV600 MW3.8 yrs66.5
MAYWOODSubstation-Adjacent230 kV300 MW3.8 yrs66.0
SADDLE BROOKSubstation-Adjacent230 kV300 MW3.8 yrs65.9
Diamond Chemical Co. SolarBrownfield—1 MW3.8 yrs65.8
EC Near Bergen Generating StationGreenfield——2.6 yrs65.6
NEW MILFORDSubstation-Adjacent230 kV300 MW3.8 yrs65.0
HILLSDALESubstation-Adjacent230 kV300 MW3.8 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Carlstadt Scientific Chemical Processing , Inc., Bergen County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.