DC Readiness
55.8
Good / 100

UNKNOWN132698 is a substation-adjacent datacenter candidate site in Windsor County, New Hampshire, interconnecting through ISO-NE. It screens at 55.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132698
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionISO-NE
Queue depth12
Avg queue wait3.9 yrs

Connectivity

Nearest IXPVELCO Rutland
IXP distance35.4 mi
Fiber providers7
Fiber coverage87.0%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterVELCO Rutland
DC distance35.4 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity19.25¢/kWh
Industrial electricity10.84¢/kWh
Cooling degree days400
Heating degree days7,400
Land price / acre$4,863

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
46
Fiber connectivity12%
44
Energy cost10%
50
Water risk8%
94
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Windsor County, ranked by DC Readiness.

Sites near UNKNOWN132698
SiteTypeVoltageCapacityQueue waitScore
COOLIDGESubstation-Adjacent345 kV600 MW3.9 yrs63.5
OZ WindsorGreenfield3.5 yrs60.2
OZ WindsorGreenfield3.5 yrs56.4
OZ WindsorGreenfield3.5 yrs56.3
UNKNOWN132753Substation-Adjacent115 kV100 MW3.9 yrs55.8
Larmie ResidenceIndustrial3.9 yrs55.7
WINDSORSubstation-Adjacent115 kV100 MW3.9 yrs54.8
WILDERSubstation-Adjacent115 kV100 MW3.9 yrs54.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.