DC Readiness
55.6
Good / 100

Mine Site is a former mine datacenter candidate site in Rockingham County, New Hampshire, interconnecting through ISO-NE. It screens at 55.6/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth12
Avg queue wait3.9 yrs

Connectivity

Nearest IXPNavisite Andover
IXP distance12.8 mi
Fiber providers7
Fiber coverage68.4%

Site characteristics

Site typeFormer Mine
Land contactRockingham County County Assessor
Former useMining: SandAndGravel; Status: Temporarily Idled
Cleanup statusTemporarily Idled

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterNavisite Andover
DC distance12.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.63¢/kWh
Industrial electricity13.26¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$17,929

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
46
Fiber connectivity12%
80
Energy cost10%
50
Water risk8%
94
Natural hazard8%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Rockingham County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
SCOBIE POND 345KVSubstation-Adjacent345 kV600 MW3.9 yrs67.9
MAMMOTH ROADSubstation-Adjacent230 kV300 MW3.9 yrs66.2
DEERFIELDSubstation-Adjacent345 kV600 MW3.9 yrs65.5
Hunt Road LandfillBrownfield6 MW3.9 yrs64.3
UNKNOWN132750Substation-Adjacent345 kV600 MW3.9 yrs64.3
WEST AMESBURYSubstation-Adjacent345 kV600 MW3.9 yrs64.1
TIMBER SWAMPSubstation-Adjacent345 kV600 MW3.9 yrs64.0
NEWINGTON 345KVSubstation-Adjacent345 kV600 MW3.9 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen