Skip to content
Gridcensus

Hillsborough County, New Hampshire · ISO-NE

DC Readiness
62.5
Good / 100

TAP137091 is a substation-adjacent datacenter candidate site in Hillsborough County, New Hampshire, interconnecting through ISO-NE. It screens at 62.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP137091
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionISO-NE
Queue depth12
Avg queue wait3.9 yrs

Connectivity

Nearest IXPColoSpace - Bedford, NH
IXP distance4.7 mi
Fiber providers8
Fiber coverage79.1%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterColoSpace - Bedford, NH
DC distance4.7 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity14.68¢/kWh
Industrial electricity13.32¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$10,594

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
46
Fiber connectivity12%
88
Energy cost10%
50
Water risk8%
94
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Hillsborough County, ranked by DC Readiness.

Sites near TAP137091
SiteTypeVoltageCapacityQueue waitScore
Manchester LandfillBrownfield3 MW3.9 yrs71.0
UNKNOWN137065Substation-Adjacent230 kV300 MW3.9 yrs68.6
BEDFORDSubstation-Adjacent230 kV300 MW3.9 yrs68.4
EAGLESubstation-Adjacent345 kV600 MW3.9 yrs68.3
UNKNOWN132736Substation-Adjacent230 kV300 MW3.9 yrs68.3
UNKNOWN132717Substation-Adjacent230 kV300 MW3.9 yrs68.2
UNKNOWN132742Substation-Adjacent230 kV300 MW3.9 yrs68.1
WATTS BROOKSubstation-Adjacent230 kV300 MW3.9 yrs68.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP137091, Hillsborough County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.