Coca-Cola Site

Industrial

Hillsborough County, New Hampshire · ISO-NE

DC Readiness
58.3
Good / 100

Coca-Cola Site is an industrial datacenter candidate site in Hillsborough County, New Hampshire, interconnecting through ISO-NE. It screens at 58.3/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth12
Avg queue wait3.9 yrs

Connectivity

Nearest IXPConsolidated - 770 Elm St.
IXP distance0.8 mi
Fiber providers8
Fiber coverage79.1%

Site characteristics

Site typeIndustrial
Land contactHillsborough County County Assessor

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterConsolidated - 770 Elm St.
DC distance0.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity14.68¢/kWh
Industrial electricity13.32¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$10,594

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
46
Fiber connectivity12%
96
Energy cost10%
50
Water risk8%
94
Natural hazard8%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Hillsborough County, ranked by DC Readiness.

Sites near Coca-Cola Site
SiteTypeVoltageCapacityQueue waitScore
Manchester LandfillBrownfield3 MW3.9 yrs71.0
UNKNOWN137065Substation-Adjacent230 kV300 MW3.9 yrs68.6
BEDFORDSubstation-Adjacent230 kV300 MW3.9 yrs68.4
EAGLESubstation-Adjacent345 kV600 MW3.9 yrs68.3
UNKNOWN132736Substation-Adjacent230 kV300 MW3.9 yrs68.3
UNKNOWN132717Substation-Adjacent230 kV300 MW3.9 yrs68.2
UNKNOWN132742Substation-Adjacent230 kV300 MW3.9 yrs68.1
WATTS BROOKSubstation-Adjacent230 kV300 MW3.9 yrs68.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.