Skip to content
Gridcensus

L.W. Packard Mill (Lot 8-2)

Industrial

Grafton County, New Hampshire · ISO-NE

DC Readiness
52.6
Fair / 100

L.W. Packard Mill (Lot 8-2) is an industrial datacenter candidate site in Grafton County, New Hampshire, interconnecting through ISO-NE. It screens at 52.6/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth12
Avg queue wait3.9 yrs

Connectivity

Nearest IXPConsolidated - 770 Elm St.
IXP distance49.4 mi
Fiber providers10
Fiber coverage63.8%

Site characteristics

Site typeIndustrial
Land contactGrafton County County Assessor

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterConsolidated - 770 Elm St.
DC distance49.4 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.55¢/kWh
Industrial electricity13.15¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$4,312

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
46
Fiber connectivity12%
68
Energy cost10%
50
Water risk8%
94
Natural hazard8%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Grafton County, ranked by DC Readiness.

Sites near L.W. Packard Mill (Lot 8-2)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN172515Substation-Adjacent115 kV100 MW3.9 yrs54.5
UNKNOWN137084Substation-Adjacent115 kV100 MW3.9 yrs54.5
UNKNOWN137085Substation-Adjacent115 kV100 MW3.9 yrs53.7
Westboro Rail Yard - Tidewater ParcelIndustrial3.9 yrs52.6
L.W. Packard Mill (Lots 4-16 and 7-7)Industrial3.9 yrs52.6
Mine SiteFormer Mine3.9 yrs52.6
Mine SiteFormer Mine3.9 yrs52.5
Woodsville Rail YardIndustrial3.9 yrs52.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for L.W. Packard Mill (Lot 8-2), Grafton County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.