Wausau Paper Plant Parcel A-2 100/3

Industrial

Coos County, New Hampshire · ISO-NE

DC Readiness
38.8
Limited / 100

Wausau Paper Plant Parcel A-2 100/3 is a industrial datacenter candidate site in Coos County, New Hampshire, interconnecting through ISO-NE. It screens at 38.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth6

Connectivity

Nearest IXPTech Vault South Burlington
IXP distance81.0 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterTech Vault South Burlington
DC distance81.0 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.16¢/kWh
Industrial electricity13.23¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$4,071

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
53
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Coos County, ranked by DC Readiness.

Sites near Wausau Paper Plant Parcel A-2 100/3
SiteTypeVoltageCapacityQueue waitScore
PONTOOK HYDRO FACILITYSubstation-Adjacent115 kV100 MW3.5 yrs64.7
LOST NATIONSubstation-Adjacent115 kV100 MW3.5 yrs64.5
UNKNOWN137036Substation-Adjacent115 kV100 MW3.5 yrs62.8
UNKNOWN137038Substation-Adjacent115 kV100 MW3.5 yrs62.5
TAP137032Substation-Adjacent115 kV100 MW3.5 yrs62.2
UNKNOWN137035Substation-Adjacent115 kV100 MW3.5 yrs61.0
UNKNOWN132759Substation-Adjacent115 kV100 MW3.5 yrs59.1
UNKNOWN132759Substation-Adjacent115 kV100 MW3.5 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Wausau Paper Plant Parcel A-2 100/3, Coos County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.