TAP136713 is a substation-adjacent datacenter candidate site in Caledonia County, New Hampshire, interconnecting through ISO-NE. It screens at 57.4/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP136713
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionISO-NE
Queue depth12
Avg queue wait3.9 yrs

Connectivity

Nearest IXPTech Vault South Burlington
IXP distance62.6 mi
Fiber providers7
Fiber coverage46.1%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterTech Vault South Burlington
DC distance62.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity19.00¢/kWh
Industrial electricity11.47¢/kWh
Cooling degree days400
Heating degree days7,400
Land price / acre$3,395

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
46
Fiber connectivity12%
28
Energy cost10%
50
Water risk8%
94
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Caledonia County, ranked by DC Readiness.

Sites near TAP136713
SiteTypeVoltageCapacityQueue waitScore
MONROESubstation-Adjacent450 kV600 MW3.9 yrs61.7
OZ CaledoniaGreenfield3.5 yrs56.5
OZ CaledoniaGreenfield3.5 yrs56.0
Gilman MillBrownfield4 MW3.5 yrs55.7
OZ CaledoniaGreenfield3.5 yrs54.8
TAP137086Substation-Adjacent115 kV100 MW3.9 yrs53.0
ST JOHNSBURYSubstation-Adjacent115 kV100 MW3.9 yrs52.8
UNKNOWN133765Substation-Adjacent115 kV100 MW3.9 yrs52.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP136713, Caledonia County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.