Skip to content
Gridcensus

PUCI, Well 4

Industrial

Nye County, Nevada · WECC

DC Readiness
48.2
Fair / 100

PUCI, Well 4 is an industrial datacenter candidate site in Nye County, Nevada, interconnecting through WECC. It screens at 48.2/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

UtilityVALLEY ELECTRIC ASSN, INCcooperative

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth53
Avg queue wait6.9 yrs

Connectivity

Nearest IXPSwitch Las Vegas
IXP distance39.1 mi
Fiber providers2
Fiber coverage70.9%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenterSwitch Las Vegas 14
DC distance38.4 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity8.32¢/kWh
Industrial electricity6.79¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$3,089

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track PUCI, Well 4

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
10
Natural hazard6%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Nye County, ranked by DC Readiness.

Sites near PUCI, Well 4
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN305563Substation-Adjacent230 kV300 MW6.9 yrs57.6
EC Coal Nye CountyGreenfield——5.8 yrs52.6
EC Near GabbsGreenfield——5.8 yrs50.9
EC Coal Nye CountyGreenfield——5.8 yrs50.9
EC Near GabbsGreenfield——5.8 yrs50.6
EC Near GabbsGreenfield——5.8 yrs50.5
EC Near GabbsGreenfield——5.8 yrs50.4
EC Near GabbsGreenfield——5.8 yrs50.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PUCI, Well 4, Nye County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.