Calvada Eye

Industrial

Nye County, Nevada · WECC

DC Readiness
46.3
Fair / 100

Calvada Eye is an industrial datacenter candidate site in Nye County, Nevada, interconnecting through WECC. It screens at 46.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityVALLEY ELECTRIC ASSN, INCcooperative

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth77
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPSwitch Las Vegas
IXP distance43.7 mi
Fiber providers2
Fiber coverage70.9%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenterSwitch Las Vegas 14
DC distance43.0 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity8.32¢/kWh
Industrial electricity6.79¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$3,089

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Calvada Eye

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
62
Energy cost10%
50
Water risk7%
10
Natural hazard6%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Nye County, ranked by DC Readiness.

Sites near Calvada Eye
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN305563Substation-Adjacent230 kV300 MW3.5 yrs56.3
EC Coal Nye CountyGreenfield——3.5 yrs52.9
EC Coal Nye CountyGreenfield——3.5 yrs51.1
EC Near GabbsGreenfield——3.5 yrs51.1
EC Near GabbsGreenfield——3.5 yrs50.8
EC Near GabbsGreenfield——3.5 yrs50.7
EC Near GabbsGreenfield——3.5 yrs50.6
EC Near GabbsGreenfield——3.5 yrs50.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Calvada Eye, Nye County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.