UNKNOWN301235

Substation-Adjacent

Mohave County, Nevada · WECC

DC Readiness
51.4
Fair / 100

UNKNOWN301235 is a substation-adjacent datacenter candidate site in Mohave County, Nevada, interconnecting through WECC. It screens at 51.4/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN301235
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityNEVADA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWClean Transition Tariff (large loads)

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth53
Avg queue wait6.9 yrs

Connectivity

Nearest IXPDataBank Las Vegas (LAS1)
IXP distance70.5 mi
Fiber providers10
Fiber coverage79.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Extremely High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterGoogle
DC distance67.5 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity13.22¢/kWh
Industrial electricity10.83¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$1,045

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN301235

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
57
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
16
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Mohave County, ranked by DC Readiness.

Sites near UNKNOWN301235
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN301539Substation-Adjacent500 kV1,000 MW6.9 yrs65.6
PEACOCKSubstation-Adjacent345 kV600 MW6.9 yrs59.0
EC Coal Mohave CountyGreenfield——5.7 yrs58.5
EC Coal Mohave CountyGreenfield——5.7 yrs58.4
MCCONNICOSubstation-Adjacent230 kV300 MW6.9 yrs57.8
GRIFFITHSubstation-Adjacent230 kV300 MW6.9 yrs57.7
DAVISSubstation-Adjacent230 kV300 MW6.9 yrs57.6
UNKNOWN310988Substation-Adjacent230 kV300 MW6.9 yrs57.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.