Former Senior Center Parking Lot

Industrial

Elko County, Nevada · WECC

DC Readiness
39.4
Limited / 100

Former Senior Center Parking Lot is a industrial datacenter candidate site in Elko County, Nevada, interconnecting through WECC. It screens at 39.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity7.61¢/kWh
Industrial electricity5.50¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$647

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
57
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
10
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Elko County, ranked by DC Readiness.

Sites near Former Senior Center Parking Lot
SiteTypeVoltageCapacityQueue waitScore
HUMBOLDTSubstation-Adjacent345 kV600 MW5.8 yrs65.0
COYOTE CREEKSubstation-Adjacent345 kV600 MW5.8 yrs60.4
Greenfield (MIDPOINT - HUMBOLDT)Greenfield345 kV600 MW5.8 yrs59.8
Greenfield (MIDPOINT - HUMBOLDT)Greenfield345 kV600 MW5.8 yrs59.0
EIGHT MILE CREEKSubstation-Adjacent120 kV100 MW5.8 yrs59.0
ELKOSubstation-Adjacent120 kV100 MW5.8 yrs58.9
Greenfield (MIDPOINT - HUMBOLDT)Greenfield345 kV600 MW5.8 yrs58.9
Greenfield (MIDPOINT - HUMBOLDT)Greenfield345 kV600 MW5.8 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Former Senior Center Parking Lot, Elko County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.