Washoe Tribe - Pagoda Building

Industrial

Douglas County, Nevada · WECC

DC Readiness
43.9
Fair / 100

Washoe Tribe - Pagoda Building is an industrial datacenter candidate site in Douglas County, Nevada, interconnecting through WECC. It screens at 43.9/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth53
Avg queue wait6.9 yrs

Connectivity

Nearest IXPRoller Network (Reno, NV)
IXP distance40.8 mi
Fiber providers2
Fiber coverage9.2%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score88/100

Location context

Nearest datacenterRoller Network (Reno, NV)
DC distance40.8 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity5.83¢/kWh
Industrial electricity5.01¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$2,627

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
45
Fiber connectivity12%
45
Energy cost10%
50
Water risk8%
10
Natural hazard8%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
25

Nearby comparable sites

Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.

Sites near Washoe Tribe - Pagoda Building
SiteTypeVoltageCapacityQueue waitScore
EC FFE Douglas CountyGreenfield5.8 yrs50.1
BUCKEYESubstation-Adjacent230 kV300 MW6.9 yrs50.0
LTBMU-NEVADAFederal Excess3.3 yrs46.0
LTBMU-NEVADAFederal Excess3.3 yrs45.9
LTBMU-CALIFORNIAFederal Excess3.3 yrs45.7
Washoe ProjectFederal Excess3.3 yrs45.7
Slaughterhouse PropertyIndustrial6.9 yrs45.0
LAHONTAN NATIONAL FISH HATCHERYFederal Excess3.3 yrs45.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Washoe Tribe - Pagoda Building, Douglas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.