Eagle Gas Station is a industrial datacenter candidate site in Douglas County, Nevada, interconnecting through WECC. It screens at 35.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionWECC
Queue depth74

Connectivity

Nearest IXPRoller Network (Reno, NV)
IXP distance36.6 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterRoller Network (Reno, NV)
DC distance36.6 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity5.83¢/kWh
Industrial electricity5.01¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$2,627

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
25
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.

Sites near Eagle Gas Station
SiteTypeVoltageCapacityQueue waitScore
BUCKEYESubstation-Adjacent120 kV100 MW5.8 yrs56.8
Greenfield (FORT CHURCHILL - BUCKEYE)Greenfield120 kV100 MW5.8 yrs52.0
Greenfield (FORT CHURCHILL - BUCKEYE)Greenfield120 kV100 MW5.8 yrs50.4
EC FFE Douglas CountyGreenfield5.8 yrs49.5
Greenfield (MEYERS - BUCKEYE)Greenfield120 kV100 MW5.8 yrs47.0
Greenfield (MEYERS - BUCKEYE)Greenfield120 kV100 MW5.8 yrs43.9
LTBMU-NEVADAFederal Excess41.6
Washoe ProjectFederal Excess41.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Eagle Gas Station, Douglas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.