DIXIE VALLEY is a substation-adjacent datacenter candidate site in Churchill, Nevada, interconnecting through WECC. It screens at 52.1/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationDIXIE VALLEY
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionWECC
Queue depth53
Avg queue wait6.9 yrs

Connectivity

Nearest IXPSwitch Tahoe Reno
IXP distance91.3 mi
Fiber providers2
Fiber coverage69.1%

Site characteristics

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score88/100

Location context

Nearest datacenterTesla Gigafactory
DC distance89.4 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (sales_tax_abatement)
Commercial electricity5.83¢/kWh
Industrial electricity5.01¢/kWh
Cooling degree days2,000
Heating degree days3,700
Land price / acre$2,955

Incentive detail: Partial abatement of sales/use tax and personal property tax for $25M+ DC investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
45
Fiber connectivity12%
34
Energy cost10%
50
Water risk8%
10
Natural hazard8%
88
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
25

Nearby comparable sites

Other scored datacenter candidate sites in Churchill, ranked by DC Readiness.

Sites near DIXIE VALLEY
SiteTypeVoltageCapacityQueue waitScore
EC Near LahontanGreenfield5.8 yrs57.8
EC Near LahontanGreenfield5.8 yrs56.8
EC Near LahontanGreenfield5.8 yrs56.4
EC Near LahontanGreenfield5.8 yrs55.8
EC Near FallonGreenfield5.8 yrs55.0
EC Near LahontanGreenfield5.8 yrs54.9
EC Near LahontanGreenfield5.8 yrs54.7
EC Near LahontanGreenfield5.8 yrs54.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DIXIE VALLEY, Churchill. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.