Skip to content
Gridcensus

UNKNOWN131827

Substation-Adjacent

Todd County, Nebraska · SPP

DC Readiness
51.0
Fair / 100

UNKNOWN131827 is a substation-adjacent datacenter candidate site in Todd County, Nebraska, interconnecting through SPP. It screens at 51.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN131827
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityLACREEK ELECTRIC ASSN, INCnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.3 yrs

Connectivity

Fiber providers4
Fiber coverage18.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (no_income_tax)
Commercial electricity9.16¢/kWh
Industrial electricity10.25¢/kWh
Cooling degree days700
Heating degree days7,300
Land price / acre$1,168

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: No state corporate income tax; no personal income tax; no personal property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN131827

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
52
Fiber connectivity12%
21
Energy cost10%
50
Water risk7%
76
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
10
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Todd County, ranked by DC Readiness.

Sites near UNKNOWN131827
SiteTypeVoltageCapacityQueue waitScore
OZ ToddGreenfield——1.0 yrs55.4
UNKNOWN131266Substation-Adjacent115 kV100 MW3.3 yrs51.8
UNKNOWN131233Substation-Adjacent115 kV100 MW3.3 yrs51.8
UNKNOWN132460Substation-Adjacent115 kV100 MW3.3 yrs51.0
UNKNOWN131826Substation-Adjacent115 kV100 MW3.3 yrs51.0
Grace Broken LegsIndustrial——3.3 yrs47.4
Blue Thunder Dump PropertyIndustrial——3.3 yrs47.3
He Dog DumpIndustrial——3.3 yrs47.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN131827, Todd County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.