Rock County, Nebraska · SPP

DC Readiness
51.2
Fair / 100

TAP168220 is a substation-adjacent datacenter candidate site in Rock County, Nebraska, interconnecting through SPP. It screens at 51.2/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP168220
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityKBR RURAL PUBLIC POWER DISTRICTnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.3 yrs

Connectivity

Nearest IXPMidco Yankton
IXP distance106.9 mi
Fiber providers3
Fiber coverage6.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterMidco Yankton
DC distance106.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Cooling degree days1,000
Heating degree days6,200
Land price / acre$1,482

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track TAP168220

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
52
Fiber connectivity12%
50
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Rock County, ranked by DC Readiness.

Sites near TAP168220
SiteTypeVoltageCapacityQueue waitScore
TAP168222Substation-Adjacent69 kV50 MW3.3 yrs51.3
TAP168227Substation-Adjacent69 kV50 MW3.3 yrs51.3
TAP168219Substation-Adjacent69 kV50 MW3.3 yrs51.3
UNKNOWN168225Substation-Adjacent69 kV50 MW3.3 yrs51.2
TAP168224Substation-Adjacent69 kV50 MW3.3 yrs51.1
UNKNOWN144148Substation-Adjacent69 kV50 MW3.3 yrs49.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP168220, Rock County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.