Richardson County, Nebraska · SPP

DC Readiness
54.1
Fair / 100

TAP159386 is a substation-adjacent datacenter candidate site in Richardson County, Nebraska, interconnecting through SPP. It screens at 54.1/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP159386
Nearest grid bottleneckTMP918_33023 · 49 km (SPP)
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityOMAHA PUBLIC POWER DISTRICTpolitical subdivisionfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.3 yrs

Connectivity

Nearest IXPTierPoint Omaha - Midlands
IXP distance71.0 mi
Fiber providers5
Fiber coverage89.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterTierPoint Omaha - Midlands
DC distance71.0 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.36¢/kWh
Industrial electricity4.52¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$5,087

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 7 nearby

Get alerts

Track TAP159386

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
52
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Richardson County, ranked by DC Readiness.

Sites near TAP159386
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131626Substation-Adjacent161 kV100 MW3.3 yrs57.6
UNKNOWN132676Substation-Adjacent161 kV100 MW3.3 yrs56.4
UNKNOWN131636Substation-Adjacent161 kV100 MW3.3 yrs56.2
UNKNOWN148624Substation-Adjacent69 kV50 MW3.3 yrs54.8
UNKNOWN158087Substation-Adjacent69 kV50 MW3.3 yrs54.1
TAP159387Substation-Adjacent69 kV50 MW3.3 yrs54.1
UNKNOWN159388Substation-Adjacent69 kV50 MW3.3 yrs54.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP159386, Richardson County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.