UNKNOWN131956

Substation-Adjacent

Red Willow County, Nebraska · SPP

DC Readiness
54.0
Fair / 100

UNKNOWN131956 is a substation-adjacent datacenter candidate site in Red Willow County, Nebraska, interconnecting through SPP. It screens at 54.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN131956
Nearest grid bottleneckSIDOGASIDKEY · 133 km (SPP)
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNEBRASKA PUBLIC POWER DISTRICTpolitical subdivisionfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth25
Avg queue wait3.3 yrs

Connectivity

Nearest IXPBeloit-NOC
IXP distance144.7 mi
Fiber providers5
Fiber coverage82.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterCompute North
DC distance91.6 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.48¢/kWh
Industrial electricity9.97¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$2,366

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN131956

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
33
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Red Willow County, ranked by DC Readiness.

Sites near UNKNOWN131956
SiteTypeVoltageCapacityQueue waitScore
RED WILLOWSubstation-Adjacent345 kV600 MW3.3 yrs59.9
OZ Red WillowGreenfield——3.5 yrs57.8
TAP161726Substation-Adjacent69 kV50 MW3.3 yrs52.2
TAP159483Substation-Adjacent69 kV50 MW3.3 yrs52.2
UNKNOWN168011Substation-Adjacent69 kV50 MW3.3 yrs52.1
UNKNOWN148591Substation-Adjacent69 kV50 MW3.3 yrs52.1
TAP159485Substation-Adjacent69 kV50 MW3.3 yrs52.0
TAP161731Substation-Adjacent69 kV50 MW3.3 yrs52.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN131956, Red Willow County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.