UNKNOWN132426

Substation-Adjacent

Jefferson County, Nebraska · SPP

DC Readiness
56.4
Good / 100

UNKNOWN132426 is a substation-adjacent datacenter candidate site in Jefferson County, Nebraska, interconnecting through SPP. It screens at 56.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN132426
Nearest grid bottleneckTMP918_33023 · 96 km (SPP)
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNORRIS PUBLIC POWER DISTRICTpolitical subdivisionfavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.3 yrs

Connectivity

Nearest IXPLincoln Data Centers
IXP distance55.7 mi
Fiber providers9
Fiber coverage76.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterLincoln Data Centers
DC distance55.7 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.50¢/kWh
Industrial electricity7.17¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$5,724

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN132426

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
52
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
60
Natural hazard6%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson County, ranked by DC Readiness.

Sites near UNKNOWN132426
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132423Substation-Adjacent115 kV100 MW3.3 yrs56.3
UNKNOWN132422Substation-Adjacent115 kV100 MW3.3 yrs56.3
UNKNOWN148727Substation-Adjacent115 kV100 MW3.3 yrs56.2
Mine SiteFormer Mine——3.3 yrs50.6
Pollman's Heating and AirIndustrial——3.3 yrs50.6
Mine SiteFormer Mine——3.3 yrs50.6
Former Fairbury FMGP siteIndustrial——3.3 yrs50.6
Mine SiteFormer Mine——3.3 yrs50.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN132426, Jefferson County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.