Dundy County, Nebraska · SPP

DC Readiness
52.4
Fair / 100

TAP168056 is a substation-adjacent datacenter candidate site in Dundy County, Nebraska, interconnecting through SPP. It screens at 52.4/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP168056
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionSPP
Queue depth13
Avg queue wait3.3 yrs

Connectivity

Fiber providers3
Fiber coverage98.1%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterCompute North
DC distance138.6 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.27¢/kWh
Industrial electricity12.07¢/kWh
Cooling degree days1,000
Heating degree days6,200
Land price / acre$1,991

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
53
Fiber connectivity12%
51
Energy cost10%
50
Water risk8%
60
Natural hazard8%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Dundy County, ranked by DC Readiness.

Sites near TAP168056
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN157314Substation-Adjacent69 kV50 MW3.3 yrs52.4
TAP168055Substation-Adjacent69 kV50 MW3.3 yrs52.4
UNKNOWN168051Substation-Adjacent69 kV50 MW3.3 yrs52.4
TAP168050Substation-Adjacent69 kV50 MW3.3 yrs52.4
UNKNOWN158094Substation-Adjacent69 kV50 MW3.3 yrs52.4
TAP168047Substation-Adjacent69 kV50 MW3.3 yrs52.4
TAP168048Substation-Adjacent69 kV50 MW3.3 yrs52.4
TAP168053Substation-Adjacent69 kV50 MW3.3 yrs52.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.