Skip to content
Gridcensus

Boyd County, Nebraska · SPP

DC Readiness
54.2
Fair / 100

TAP134699 is a substation-adjacent datacenter candidate site in Boyd County, Nebraska, interconnecting through SPP. It screens at 54.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP134699
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNIOBRARA VALLEY EL MEMBER CORPnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth27
Avg queue wait3.3 yrs

Connectivity

Nearest IXPMidco Yankton
IXP distance61.5 mi
Fiber providers4
Fiber coverage100.0%

Site characteristics

Risk & environment

Environmental constraintLow (25/100)
Flood zoneZone A (SFHA)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score57/100

Location context

Nearest datacenterMidco Yankton
DC distance61.5 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Cooling degree days1,000
Heating degree days6,200
Land price / acre$2,664

Regulatory climate

Favorablestate posture · as of 2026-08

Public-power incentives; DC-friendly.

DC tax incentiveYes

Incentive detail: ImagiNE Nebraska Act: sales tax exemption on DC equipment; investment tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Get alerts

Track TAP134699

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
52
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
60
Natural hazard6%
57
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Boyd County, ranked by DC Readiness.

Sites near TAP134699
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131238Substation-Adjacent115 kV100 MW3.3 yrs55.7
Spencer HydroBrownfield—2 MW3.5 yrs54.1
UNKNOWN168218Substation-Adjacent69 kV50 MW3.3 yrs53.1
Mine SiteFormer Mine——3.3 yrs48.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP134699, Boyd County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.