Powder River County, Montana · SPP

DC Readiness
58.3
Good / 100

TAP206226 is a substation-adjacent datacenter candidate site in Powder River County, Montana, interconnecting through SPP. It screens at 58.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP206226
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityTONGUE RIVER ELECTRIC COOP INCnot availablefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth1
Avg queue wait3.3 yrs

Connectivity

Nearest IXPACT Colstrip
IXP distance27.4 mi
Fiber providers1
Fiber coverage51.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score88/100

Location context

Nearest datacenterACT Colstrip
DC distance27.4 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (property_tax_abatement)
Commercial electricity14.37¢/kWh
Industrial electricity6.47¢/kWh
Cooling degree days400
Heating degree days7,600
Land price / acre$957

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: New/expanding industry tax abatement available for DC construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP206226

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
58
Fiber connectivity12%
49
Energy cost10%
50
Water risk7%
56
Natural hazard6%
88
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Powder River County, ranked by DC Readiness.

Sites near TAP206226
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN205561Substation-Adjacent115 kV100 MW3.3 yrs58.7
EC Coal Powder River CountyGreenfield——1.1 yrs58.5
UNKNOWN205562Substation-Adjacent115 kV100 MW3.3 yrs58.5
UNKNOWN205566Substation-Adjacent115 kV100 MW3.3 yrs54.7
UNKNOWN205567Substation-Adjacent115 kV100 MW3.3 yrs53.9
UNKNOWN208419Substation-Adjacent115 kV100 MW3.3 yrs53.9
Mine SiteFormer Mine——3.3 yrs48.3
Former Park Super ServiceIndustrial——3.3 yrs47.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for TAP206226, Powder River County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.