Fort Benton Visitor Center

Industrial

Chouteau County, Montana · SPP

DC Readiness
55.0
Good / 100

Fort Benton Visitor Center is an industrial datacenter candidate site in Chouteau County, Montana, interconnecting through SPP. It screens at 55.0/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionSPP
Queue depth1
Avg queue wait3.3 yrs

Connectivity

Nearest IXPJSLLC Bozeman
IXP distance148.7 mi
Fiber providers5
Fiber coverage94.2%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score88/100

Location context

Nearest datacenterJSLLC Bozeman
DC distance148.7 mi
County hazard (FEMA NRI)Very Low (12)
DC tax incentiveYes (property_tax_abatement)
Commercial electricity8.33¢/kWh
Industrial electricity7.62¢/kWh
Cooling degree days400
Heating degree days7,600
Land price / acre$1,356

Incentive detail: New/expanding industry tax abatement available for DC construction.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
66
Fiber connectivity12%
75
Energy cost10%
50
Water risk8%
56
Natural hazard8%
88
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
54
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Chouteau County, ranked by DC Readiness.

Sites near Fort Benton Visitor Center
SiteTypeVoltageCapacityQueue waitScore
VERONASubstation-Adjacent230 kV300 MW3.3 yrs62.0
UNKNOWN206841Substation-Adjacent132 kV100 MW3.3 yrs57.7
UNKNOWN208226Substation-Adjacent69 kV50 MW3.3 yrs55.6
UNKNOWN208232Substation-Adjacent69 kV50 MW3.3 yrs55.6
BIG SANDYSubstation-Adjacent69 kV50 MW3.3 yrs55.6
TAP208215Substation-Adjacent69 kV50 MW3.3 yrs55.6
UNKNOWN208222Substation-Adjacent69 kV50 MW3.3 yrs55.6
TAP208231Substation-Adjacent69 kV50 MW3.3 yrs55.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Fort Benton Visitor Center, Chouteau County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.