Skip to content
Gridcensus

FORISTELL MO VOR/BUEC BLDG

Federal Excess

Warren County, Missouri · PJM

DC Readiness
49.2
Fair / 100

FORISTELL MO VOR/BUEC BLDG is a federal excess datacenter candidate site in Warren County, Missouri, interconnecting through PJM. It screens at 49.2/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPTierPoint St. Louis – Millpark
IXP distance30.2 mi
Fiber providers6
Fiber coverage67.8%

Site characteristics

Acreage93 ac
Buildable load (est.)~37–93 MWland-based
Land contactWarren County County Assessor
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterTierPoint St. Louis – Millpark
DC distance30.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.70¢/kWh
Industrial electricity8.21¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,779

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track FORISTELL MO VOR/BUEC BLDG

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
61
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Warren County, ranked by DC Readiness.

Sites near FORISTELL MO VOR/BUEC BLDG
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117720Substation-Adjacent161 kV100 MW2.8 yrs56.4
UNKNOWN117962Substation-Adjacent161 kV100 MW2.8 yrs56.2
UNKNOWN121111Substation-Adjacent161 kV100 MW2.8 yrs56.2
UNKNOWN117951Substation-Adjacent161 kV100 MW2.8 yrs56.2
UNKNOWN121112Substation-Adjacent161 kV100 MW2.8 yrs56.2
UNKNOWN117718Substation-Adjacent69 kV50 MW2.8 yrs53.8
UNKNOWN121460Substation-Adjacent69 kV50 MW2.8 yrs53.8
Greenfield (UNKNOWN117962 - UNKNOWN121112)Greenfield161 kV100 MW2.8 yrs49.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FORISTELL MO VOR/BUEC BLDG, Warren County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.