EC Coal Vernon County
GreenfieldVernon County, Missouri · MISO
EC Coal Vernon County is a greenfield datacenter candidate site in Vernon County, Missouri, interconnecting through MISO. It screens at 54.8/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Shorter queues and healthier completion here — a faster path to energization than the national norm.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.
Site location
Get alerts
Track EC Coal Vernon County
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Vernon County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC FFE Vernon County | Greenfield | — | — | 1.4 yrs | 59.3 |
| EC Coal Vernon County | Greenfield | — | — | 1.4 yrs | 57.3 |
| UNKNOWN121632 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| UNKNOWN121631 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.1 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 48.8 |
| Old Sheldon School | Industrial | — | — | 2.8 yrs | 48.5 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 48.4 |
| Mine Site | Former Mine | — | — | 2.8 yrs | 48.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.