Parcel 2E09 NCMRWC Dixon Properties is an industrial datacenter candidate site in Sullivan County, Missouri, interconnecting through SERC. It screens at 52.6/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

UtilityMACON ELECTRIC COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth52
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPConnect Des Moines
IXP distance94.8 mi
Fiber providers3
Fiber coverage99.4%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterAT&T DC
DC distance26.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.43¢/kWh
Industrial electricity7.38¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$3,213

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Parcel 2E09 NCMRWC Dixon Properties

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Sullivan County, ranked by DC Readiness.

Sites near Parcel 2E09 NCMRWC Dixon Properties
SiteTypeVoltageCapacityQueue waitScore
OZ SullivanGreenfield——3.9 yrs61.3
UNKNOWN117364Substation-Adjacent161 kV100 MW3.9 yrs59.7
OZ SullivanGreenfield——3.9 yrs58.5
UNKNOWN117370Substation-Adjacent69 kV50 MW3.9 yrs56.9
UNKNOWN117371Substation-Adjacent69 kV50 MW3.9 yrs56.8
UNKNOWN118650Substation-Adjacent69 kV50 MW3.9 yrs56.8
UNKNOWN117341Substation-Adjacent69 kV50 MW3.9 yrs56.8
UNKNOWN117367Substation-Adjacent69 kV50 MW3.9 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Parcel 2E09 NCMRWC Dixon Properties, Sullivan County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.