Datacenter Sites in Sullivan County, Missouri

Sullivan County has 31 scored datacenter candidate sites averaging 52.2/100 DC Readiness, with a catalogued aggregate of 550 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

31
Candidate sites
52.2/100
Avg DC Readiness
550 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Sullivan County

Site-selection context for Sullivan County

Yessales_tax_exemption
Datacenter tax incentive
11.43¢/kWh
Commercial electricity
7.38¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$3,213
Land price / acre
1,500
Cooling degree days
4,700
Heating degree days
56°F
Mean annual temp

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

By site type

Top datacenter sites in Sullivan County

Top datacenter sites in Sullivan County
SiteTypeVoltageCapacityQueue waitScore
OZ SullivanGreenfield——1.4 yrs60.1
UNKNOWN117364Substation-Adjacent161 kV100 MW2.8 yrs57.3
OZ SullivanGreenfield——1.4 yrs57.3
UNKNOWN117367Substation-Adjacent69 kV50 MW2.8 yrs54.4
UNKNOWN117371Substation-Adjacent69 kV50 MW2.8 yrs54.4
UNKNOWN117370Substation-Adjacent69 kV50 MW2.8 yrs54.4
UNKNOWN118650Substation-Adjacent69 kV50 MW2.8 yrs54.4
UNKNOWN117341Substation-Adjacent69 kV50 MW2.8 yrs54.3
TAP140609Substation-Adjacent69 kV50 MW2.8 yrs54.3
UNKNOWN118651Substation-Adjacent69 kV50 MW2.8 yrs54.2
UNKNOWN117416Substation-Adjacent69 kV50 MW2.8 yrs53.9
UNKNOWN117368Substation-Adjacent69 kV50 MW2.8 yrs53.9
NCMRWC - 5E02Industrial——2.8 yrs50.5
NCMRWCIndustrial——2.8 yrs50.5
NCMRWC - 4E11Industrial——2.8 yrs50.5
NCMRWCIndustrial——2.8 yrs50.4
Parcel 3W16 - NCMRWC PropertiesIndustrial——2.8 yrs50.4
Parcel 2W06 - NCMRWC PropertiesIndustrial——2.8 yrs50.4
Parcel 1C03 - NCMRWC PropertiesIndustrial——2.8 yrs50.4
Parcel 1C02 - NCMRWC PropertiesIndustrial——2.8 yrs50.4
Parcel 1C14 - NCMRWC PropertiesIndustrial——2.8 yrs50.4
NCMRWC - 2W10Industrial——2.8 yrs50.4
Parcel 1C08 - NCMRWC PropertiesIndustrial——2.8 yrs50.4
Parcel 4E05 - NCMRW PropertiesIndustrial——2.8 yrs50.4
NCMRWCIndustrial——2.8 yrs50.3

Sullivan County datacenter FAQ

How many datacenter sites are in Sullivan County?
31 scored datacenter candidate sites, averaging 52.2/100 DC Readiness.
Does Sullivan County offer datacenter tax incentives?
Qualified data center sales tax exemption (2019 law); state income tax credits.
What is the natural-hazard risk in Sullivan County?
FEMA's National Risk Index rates Sullivan County as "Relatively High" (score 38).
What are industrial electricity rates in Sullivan County?
Average industrial electricity is 7.38¢/kWh and commercial is 11.43¢/kWh in Sullivan County.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Sullivan County, Missouri. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.