Skip to content
Gridcensus

NEOSHO NATIONAL FISH HATCHERY

Federal Excess

Newton County, Missouri · PJM

DC Readiness
50.0
Fair / 100

NEOSHO NATIONAL FISH HATCHERY is a federal excess datacenter candidate site in Newton County, Missouri, interconnecting through PJM. It screens at 50.0/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityNEW-MAC ELECTRIC COOP, INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance54.9 mi
Fiber providers11
Fiber coverage37.8%

Site characteristics

Acreage12 ac
Buildable load (est.)~5–12 MWland-based
Former useForest and Wildlife

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance54.9 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.23¢/kWh
Industrial electricity8.23¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,732

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track NEOSHO NATIONAL FISH HATCHERY

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
37
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Newton County, ranked by DC Readiness.

Sites near NEOSHO NATIONAL FISH HATCHERY
SiteTypeVoltageCapacityQueue waitScore
OZ NewtonGreenfield——1.4 yrs58.8
OZ NewtonGreenfield——1.4 yrs58.3
EC Coal Newton CountyGreenfield——1.4 yrs55.3
UNKNOWN121715Substation-Adjacent161 kV100 MW2.8 yrs54.3
UNKNOWN117571Substation-Adjacent161 kV100 MW2.8 yrs54.3
TAP149098Substation-Adjacent161 kV100 MW2.8 yrs53.3
UNKNOWN117514Substation-Adjacent161 kV100 MW2.8 yrs53.3
UNKNOWN117673Substation-Adjacent161 kV100 MW2.8 yrs53.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for NEOSHO NATIONAL FISH HATCHERY, Newton County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.