MALDEN(RISCO CITY)MO (VOR)

Federal Excess

New Madrid County, Missouri · PJM

DC Readiness
46.7
Fair / 100

MALDEN(RISCO CITY)MO (VOR) is a federal excess datacenter candidate site in New Madrid County, Missouri, interconnecting through PJM. It screens at 46.7/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance77.1 mi
Fiber providers4
Fiber coverage40.1%

Site characteristics

Acreage72 ac
Buildable load (est.)~29–72 MWland-based
Land contactNew Madrid County County Assessor
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterRiot Kentucky
DC distance76.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.29¢/kWh
Industrial electricity7.59¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$6,704

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track MALDEN(RISCO CITY)MO (VOR)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in New Madrid County, ranked by DC Readiness.

Sites near MALDEN(RISCO CITY)MO (VOR)
SiteTypeVoltageCapacityQueue waitScore
NEW MADRIDSubstation-Adjacent500 kV1,000 MW2.8 yrs63.7
WEST NEW MADRIDSubstation-Adjacent500 kV1,000 MW2.8 yrs62.9
OZ New MadridGreenfield——1.4 yrs57.0
OZ New MadridGreenfield——1.4 yrs56.2
OZ New MadridGreenfield——1.4 yrs55.9
UNKNOWN117855Substation-Adjacent161 kV100 MW2.8 yrs55.6
OZ New MadridGreenfield——1.4 yrs55.5
UNKNOWN122582Substation-Adjacent161 kV100 MW2.8 yrs54.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.