Skip to content
Gridcensus

Mine Site

Former Mine

Jefferson, Missouri · MISO

DC Readiness
50.2
Fair / 100

Mine Site is a former mine datacenter candidate site in Jefferson, Missouri, interconnecting through MISO. It screens at 50.2/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait2.8 yrs

Connectivity

Nearest IXPCogent St Louis
IXP distance25.4 mi
Fiber providers5
Fiber coverage34.7%

Site characteristics

Site typeFormer Mine
Land contactJefferson County County Assessor
Former useMining: Nonmetal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterGenome Data Center
DC distance25.5 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.54¢/kWh
Industrial electricity7.73¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,915

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117709Substation-Adjacent345 kV600 MW2.8 yrs61.8
EC Near Rush IslandGreenfield1.4 yrs57.8
EC Near Rush IslandGreenfield1.4 yrs57.7
EC Near Rush IslandGreenfield1.4 yrs57.7
UNKNOWN117702Substation-Adjacent138 kV100 MW2.8 yrs57.3
EC Near Rush IslandGreenfield1.4 yrs56.8
UNKNOWN117895Substation-Adjacent138 kV100 MW2.8 yrs56.5
TAP139433Substation-Adjacent138 kV100 MW2.8 yrs56.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Jefferson. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.