EC Near Carrollton

Greenfield

Carroll, Missouri · MISO

DC Readiness
56.1
Good / 100

EC Near Carrollton is a greenfield datacenter candidate site in Carroll, Missouri, interconnecting through MISO. It screens at 56.1/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPLightEdge Kansas City Subtropolis (KCI1)
IXP distance50.5 mi
Fiber providers5
Fiber coverage55.4%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance176.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerKCP&L GREATER MISSOURI OPERATIONS CO.
Land owner typeprivate
Buildability45.0/100
Land cover (NLCD)Cultivated Crops
Former usenear retired gas plant (5km)

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score47/100
Construction cost index96.0 (avg 100)

Location context

Nearest datacenterCenturyLink
DC distance35.8 mi
Nearest rail1.7 mi
Nearest gas pipeline0.2 mi
Nearest fiber route57.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.07¢/kWh
Industrial electricity7.23¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$5,366

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
48
Fiber connectivity12%
65
Energy cost10%
89
Water risk8%
88
Natural hazard8%
47
Buildability7%
45
Labor market4%
50
DC cluster4%
45
Land / acreage3%
47
Construction cost3%
70
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Carroll, ranked by DC Readiness.

Sites near EC Near Carrollton
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117426Substation-Adjacent161 kV100 MW1.4 yrs66.3
EC Near CarrolltonGreenfield1.4 yrs59.7
Greenfield (UNKNOWN117426 - MAURER LAKE)Greenfield161 kV100 MW1.4 yrs59.0
Greenfield (UNKNOWN117426 - MAURER LAKE)Greenfield161 kV100 MW1.4 yrs58.9
Greenfield (UNKNOWN117417 - UNKNOWN117426)Greenfield161 kV100 MW1.4 yrs57.7
EC Near CarrolltonGreenfield1.4 yrs57.1
EC Near CarrolltonGreenfield1.4 yrs57.0
EC Near CarrolltonGreenfield1.4 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Carrollton, Carroll. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.