EC FFE Barry County
GreenfieldBarry County, Missouri · MISO
EC FFE Barry County is a greenfield datacenter candidate site in Barry County, Missouri, interconnecting through MISO. It screens at 55.1/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Barry County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN117688 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 66.9 |
| BEAVER | Substation-Adjacent | 161 kV | 100 MW | 3.4 yrs | 66.1 |
| Greenfield (UNKNOWN117688 - BEAVER) | Greenfield | 161 kV | 100 MW | 3.4 yrs | 60.0 |
| Greenfield (UNKNOWN117571 - UNKNOWN117688) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 57.8 |
| Davis & Son | Industrial | — | — | — | 42.5 |
| Jumping Jacks Shoe Factory Parking Lot | Industrial | — | — | — | 42.5 |
| Jumping Jacks Shoe Factory 1 | Industrial | — | — | — | 42.5 |
| Dudley Tavern Site | Industrial | — | — | — | 42.5 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC FFE Barry County, Barry County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.