Datacenter Sites in PONTOTOC, Mississippi
PONTOTOC has 46 scored datacenter candidate sites averaging 49.5/100 DC Readiness, with a catalogued aggregate of 600 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
46
Candidate sites
49.5/100
Avg DC Readiness
600 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for PONTOTOC
Yessales_tax_exemption
Datacenter tax incentive
11.66¢/kWh
Commercial electricity
6.72¢/kWh
Industrial electricity
9
Fiber providers
Low
Water stress
$2,758
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in PONTOTOC
PONTOTOC datacenter FAQ
- How many datacenter sites are in PONTOTOC?
- 46 scored datacenter candidate sites, averaging 49.5/100 DC Readiness.
- Does PONTOTOC offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in PONTOTOC?
- FEMA's National Risk Index rates PONTOTOC as "Relatively High" (score 45).
- What are industrial electricity rates in PONTOTOC?
- Average industrial electricity is 6.72¢/kWh and commercial is 11.66¢/kWh in PONTOTOC.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for PONTOTOC, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.