PECO FOODS (NOT AVAILABLE)

Manufacturing

MADISON, Mississippi · MISO

DC Readiness
53.2
Fair / 100

PECO FOODS (NOT AVAILABLE) is a manufacturing datacenter candidate site in MADISON, Mississippi, interconnecting through MISO. It screens at 53.2/100 DC Readiness and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth59
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPC Spire Mississippi
IXP distance95.5 mi
Fiber providers6
Fiber coverage86.5%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance1.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.03¢/kWh
Industrial electricity7.24¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,486

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track PECO FOODS (NOT AVAILABLE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
50
Fiber connectivity12%
73
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in MADISON, ranked by DC Readiness.

Sites near PECO FOODS (NOT AVAILABLE)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109667Substation-Adjacent230 kV300 MW4.3 yrs63.6
UNKNOWN110124Substation-Adjacent230 kV300 MW4.3 yrs63.3
YANDELL ROADSubstation-Adjacent230 kV300 MW4.3 yrs62.8
UNKNOWN109664Substation-Adjacent230 kV300 MW4.3 yrs62.7
BOZEMAN ROADSubstation-Adjacent230 kV300 MW4.3 yrs62.6
UNKNOWN109669Substation-Adjacent230 kV300 MW4.3 yrs62.6
Greenfield (MCADAMS - LAKEOVER)Greenfield500 kV1,000 MW4.3 yrs60.7
Greenfield (RAY BRASWELL - LAKEOVER)Greenfield500 kV1,000 MW4.3 yrs60.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for PECO FOODS (NOT AVAILABLE), MADISON is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.