Greenfield (WESTPOINT - BROWNS FERRY)

Greenfield

Lawrence County, Mississippi · MISO

DC Readiness
57.4
Good / 100

Greenfield (WESTPOINT - BROWNS FERRY) is a greenfield datacenter candidate site in Lawrence County, Mississippi, interconnecting through MISO. It screens at 57.4/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWESTPOINT
Substation voltage500 kV
Available capacity1,000 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait2.8 yrs

Connectivity

Nearest IXPDC BLOX HSV1 - DCBLOX Huntsville
IXP distance33.6 mi
Fiber providers3
Fiber coverage95.8%

Site characteristics

Site typeGreenfield
Land contactLawrence County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterDC BLOX HSV1 - DCBLOX Huntsville
DC distance33.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.42¢/kWh
Industrial electricity6.10¢/kWh
Cooling degree days2,100
Heating degree days2,800
Land price / acre$4,865

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (WESTPOINT - BROWNS FERRY)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power20%
33
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
92
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
20

Nearby comparable sites

Other scored datacenter candidate sites in Lawrence County, ranked by DC Readiness.

Sites near Greenfield (WESTPOINT - BROWNS FERRY)
SiteTypeVoltageCapacityQueue waitScore
TAP149924Substation-Adjacent161 kV100 MW1.0 yrs63.5
UNKNOWN114934Substation-Adjacent161 kV100 MW1.0 yrs62.5
NANCESubstation-Adjacent161 kV100 MW1.0 yrs62.1
SPRING CREEKSubstation-Adjacent161 kV100 MW1.0 yrs62.1
TAP155253Substation-Adjacent161 kV100 MW1.0 yrs62.1
UNKNOWN111068Substation-Adjacent161 kV100 MW1.0 yrs61.1
OZ LawrenceGreenfield——3.7 yrs61.0
TAP155255Substation-Adjacent161 kV100 MW1.0 yrs60.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (WESTPOINT - BROWNS FERRY), Lawrence County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.