JONES has 66 scored datacenter candidate sites averaging 50.4/100 DC Readiness, with a catalogued aggregate of 1,150 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

66
Candidate sites
50.4/100
Avg DC Readiness
1,150 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in JONES

Site-selection context for JONES

Yessales_tax_exemption
Datacenter tax incentive
11.98¢/kWh
Commercial electricity
8.52¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$4,661
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in JONES

Top datacenter sites in JONES
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109611Substation-Adjacent230 kV300 MW2.8 yrs59.5
OZ JonesGreenfield——1.4 yrs58.4
UNKNOWN109739Substation-Adjacent161 kV100 MW2.8 yrs55.8
UNKNOWN169460Substation-Adjacent161 kV100 MW2.8 yrs55.7
UNKNOWN109758Substation-Adjacent115 kV100 MW2.8 yrs55.2
UNKNOWN109754Substation-Adjacent115 kV100 MW2.8 yrs55.2
UNKNOWN169458Substation-Adjacent115 kV100 MW2.8 yrs54.3
Greenfield (UNKNOWN109551 - UNKNOWN109611)Greenfield230 kV300 MW2.8 yrs53.1
UNKNOWN109748Substation-Adjacent69 kV50 MW2.8 yrs52.9
BRADY ELECTRIC, LLC (MOTOR AND GENERATOR MANUFACTURING)Manufacturing——3.5 yrs49.9
SANDERSON FARMS, INC. (OTHER ANIMAL FOOD MANUFACTURING)Manufacturing——3.5 yrs49.9
UNIVERSAL AUTO PARTS & MACHINE (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.5 yrs49.9
ALLIED UNIVERSAL CORP. (ALKALIES AND CHLORINE MANUFACTURING)Manufacturing——3.5 yrs49.9
G & K TEAMWEAR, INC. (MEN'S AND BOYS' CUT AND SEW WORK CLOTHING MANUFACTURING)Manufacturing——3.5 yrs49.8
CHRISTIAN AUTO SUPPLY CO. (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing——3.5 yrs49.8
SOUTHERN METALS CO. OF MISSISSIPPI, INC. (METAL STAMPING)Manufacturing——3.5 yrs49.8
HOWARD TECHNOLOGY SOLUTIONS (OTHER COMPUTER PERIPHERAL EQUIPMENT MANUFACTURING)Manufacturing——3.5 yrs49.8
HEADRICK SIGN CO., INC. (SIGN MANUFACTURING)Manufacturing——3.5 yrs49.8
BLACK WARRIOR WIRELINE CORP. (OIL AND GAS FIELD MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing——3.5 yrs49.8
COMMERCIAL CONSTRUCTION CO., INC. (OIL AND GAS FIELD MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing——3.5 yrs49.8
POLITUBE TRANSFORMER PRODUCTS (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING)Manufacturing——3.5 yrs49.8
HUNT SOUTHLAND REFINING CO. (PETROLEUM REFINERIES)Manufacturing——3.5 yrs49.8
LAUREL LUMBER CO. (NOT AVAILABLE)Manufacturing——3.5 yrs49.8
HOWARD INDUSTRIES, INC. (ELECTRONIC COIL, TRANSFORMER, AND OTHER INDUCTOR MANUFACTURING)Manufacturing——3.5 yrs49.8
SMITH INTERNATIONAL, INC. (OIL AND GAS FIELD MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing——3.5 yrs49.8

JONES datacenter FAQ

How many datacenter sites are in JONES?
66 scored datacenter candidate sites, averaging 50.4/100 DC Readiness.
Does JONES offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in JONES?
FEMA's National Risk Index rates JONES as "Relatively High" (score 45).
What are industrial electricity rates in JONES?
Average industrial electricity is 8.52¢/kWh and commercial is 11.98¢/kWh in JONES.

Dataset updated . Screening estimates derived from public data sources.