LeFleur's Landing
IndustrialHinds, Mississippi · MISO
LeFleur's Landing is a industrial datacenter candidate site in Hinds, Mississippi, interconnecting through MISO. It screens at 45.0/100 DC Readiness.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Hinds, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| LAKEOVER | Substation-Adjacent | 500 kV | 1,000 MW | 1.4 yrs | 74.7 |
| LAKEOVER | Substation-Adjacent | 500 kV | 1,000 MW | 1.4 yrs | 74.4 |
| RAY BRASWELL | Substation-Adjacent | 500 kV | 1,000 MW | 1.4 yrs | 73.9 |
| TINNIN ROAD | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 70.6 |
| UNKNOWN110121 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 70.5 |
| NORTHSIDE DRIVE | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 70.4 |
| ROBINSON ROAD | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 70.1 |
| SOUTHWEST JACKSON | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 69.5 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for LeFleur's Landing, Hinds. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.