JELD-WEN MILLWORK DISTRIBUTION (WOOD WINDOW AND DOOR MANUFACTURING)

Manufacturing

Hinds, Mississippi

DC Readiness
47.6
Fair / 100

JELD-WEN MILLWORK DISTRIBUTION (WOOD WINDOW AND DOOR MANUFACTURING) is a manufacturing datacenter candidate site in Hinds, Mississippi. It screens at 47.6/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPC Spire Mississippi
IXP distance112.1 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance16.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.56¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,474

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
38
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Hinds, ranked by DC Readiness.

Sites near JELD-WEN MILLWORK DISTRIBUTION (WOOD WINDOW AND DOOR MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
LAKEOVERSubstation-Adjacent500 kV1,000 MW1.4 yrs74.7
LAKEOVERSubstation-Adjacent500 kV1,000 MW1.4 yrs74.4
RAY BRASWELLSubstation-Adjacent500 kV1,000 MW1.4 yrs73.9
TINNIN ROADSubstation-Adjacent230 kV300 MW1.4 yrs70.6
UNKNOWN110121Substation-Adjacent230 kV300 MW1.4 yrs70.5
NORTHSIDE DRIVESubstation-Adjacent230 kV300 MW1.4 yrs70.4
ROBINSON ROADSubstation-Adjacent230 kV300 MW1.4 yrs70.1
SOUTHWEST JACKSONSubstation-Adjacent230 kV300 MW1.4 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JELD-WEN MILLWORK DISTRIBUTION (WOOD WINDOW AND DOOR MANUFACTURING), Hinds. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.