Skip to content
Gridcensus

Datacenter Sites in AMITE, Mississippi

AMITE has 14 scored datacenter candidate sites averaging 49.8/100 DC Readiness, with a catalogued aggregate of 300 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

14
Candidate sites
49.8/100
Avg DC Readiness
300 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 14 in AMITE

Site-selection context for AMITE

Yessales_tax_exemption
Datacenter tax incentive
13.95¢/kWh
Commercial electricity
8.62¢/kWh
Industrial electricity
3
Fiber providers
Low
Water stress
$3,315
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in AMITE

Top datacenter sites in AMITE
SiteTypeVoltageCapacityQueue waitScore
EC FFE Amite CountyGreenfield——1.4 yrs55.1
UNKNOWN110657Substation-Adjacent115 kV100 MW2.8 yrs54.3
UNKNOWN110653Substation-Adjacent115 kV100 MW2.8 yrs53.1
UNKNOWN110652Substation-Adjacent115 kV100 MW2.8 yrs52.7
GLOSTER CHIPS, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING)Manufacturing——3.5 yrs49.0
GEORGIA-PACIFIC LLC (SOFTWOOD VENEER AND PLYWOOD MANUFACTURING)Manufacturing——3.5 yrs49.0
Holy Family Catholic Church Expansion SiteIndustrial——2.8 yrs48.5
Mine SiteFormer Mine——2.8 yrs48.5
AIR CRUISERS CO., INC. (SURGICAL APPLIANCE AND SUPPLIES MANUFACTURING)Manufacturing——3.5 yrs47.9
AIR CRUISERS CO., INC. (OTHER AIRCRAFT PART AND AUXILIARY EQUIPMENT MANUFACTURING)Manufacturing——3.5 yrs47.9
FREEDOM INDUSTRIES, INC. (MEN'S AND BOYS' CUT AND SEW WORK CLOTHING MANUFACTURING)Manufacturing——3.5 yrs47.9
U.S. METAL WORKS, INC. (IRON AND STEEL MILLS)Manufacturing——3.5 yrs47.8
MABRY LUMBER CO., SAM (SAWMILLS)Manufacturing——3.5 yrs47.8
WALLACE LUMBER CO., INC. (CUT STOCK, RESAWING LUMBER, AND PLANING)Manufacturing——3.5 yrs47.7

AMITE datacenter FAQ

How many datacenter sites are in AMITE?
14 scored datacenter candidate sites, averaging 49.8/100 DC Readiness.
Does AMITE offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in AMITE?
FEMA's National Risk Index rates AMITE as "Relatively High" (score 45).
What are industrial electricity rates in AMITE?
Average industrial electricity is 8.62¢/kWh and commercial is 13.95¢/kWh in AMITE.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AMITE, Mississippi. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.