Former Brick Manufacturer

Industrial

ALCORN, Mississippi · MISO

DC Readiness
38.6
Limited / 100

Former Brick Manufacturer is a industrial datacenter candidate site in ALCORN, Mississippi, interconnecting through MISO. It screens at 38.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth13

Connectivity

Nearest IXPExpedient Memphis
IXP distance72.3 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterExpedient Memphis
DC distance72.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.88¢/kWh
Industrial electricity5.51¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,375

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
51
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in ALCORN, ranked by DC Readiness.

Sites near Former Brick Manufacturer
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN169436Substation-Adjacent161 kV100 MW1.4 yrs68.4
GLENSubstation-Adjacent161 kV100 MW1.4 yrs67.3
KOSSUTHSubstation-Adjacent161 kV100 MW1.4 yrs67.0
TAP154378Substation-Adjacent161 kV100 MW1.4 yrs66.7
TAP154382Substation-Adjacent161 kV100 MW1.4 yrs66.3
TAP154376Substation-Adjacent161 kV100 MW1.4 yrs65.4
KIMBERLY CLARKSubstation-Adjacent161 kV100 MW1.4 yrs65.4
UNKNOWN111023Substation-Adjacent161 kV100 MW1.4 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Former Brick Manufacturer, ALCORN. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.