Datacenter Sites in ALCORN, Mississippi
ALCORN has 55 scored datacenter candidate sites averaging 53.7/100 DC Readiness, with a catalogued aggregate of 1,400 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
55
Candidate sites
53.7/100
Avg DC Readiness
1,400 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for ALCORN
Yessales_tax_exemption
Datacenter tax incentive
11.88¢/kWh
Commercial electricity
5.51¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$2,375
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in ALCORN
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Alcorn | Greenfield | — | — | 1.4 yrs | 61.0 |
| KIMBERLY CLARK | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| UNKNOWN111023 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| TAP154375 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| TAP154378 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| TAP154376 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| TAP154382 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| UNKNOWN169436 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 54.3 |
| Verandah House | Industrial | — | — | 2.8 yrs | 51.2 |
| Hathcock Property | Industrial | — | — | 2.8 yrs | 51.2 |
| Judy Glenn Property | Industrial | — | — | 2.8 yrs | 51.2 |
| Former Krogers | Industrial | — | — | 2.8 yrs | 51.2 |
| Former Wurlitzer Inc. | Industrial | — | — | 2.8 yrs | 51.2 |
| Former Watkins Texaco | Industrial | — | — | 2.8 yrs | 51.2 |
| Johnsey Property | Industrial | — | — | 2.8 yrs | 51.2 |
| Former Brick Manufacturer | Industrial | — | — | 2.8 yrs | 51.2 |
| Dalton Property | Industrial | — | — | 2.8 yrs | 51.1 |
| East Fifth Street LLC - North & South Lot | Industrial | — | — | 2.8 yrs | 51.1 |
| ABILITYWORKS OF CORINTH, INC. (PUMP AND PUMPING EQUIPMENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| AUTOMATIC MACHINE PRODUCTS, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| APAC-MISSISSIPPI, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| CARAUSTAR INDUSTRIES, INC. (FIBER CAN, TUBE, DRUM, AND SIMILAR PRODUCTS MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| CORINTHIAN, INC. (UPHOLSTERED HOUSEHOLD FURNITURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| HYDRAULIC ANALYSIS, INC. (FLUID POWER PUMP AND MOTOR MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.5 |
| DAILY CORINTHIAN (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 50.5 |
ALCORN datacenter FAQ
- How many datacenter sites are in ALCORN?
- 55 scored datacenter candidate sites, averaging 53.7/100 DC Readiness.
- Does ALCORN offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in ALCORN?
- FEMA's National Risk Index rates ALCORN as "Relatively High" (score 45).
- What are industrial electricity rates in ALCORN?
- Average industrial electricity is 5.51¢/kWh and commercial is 11.88¢/kWh in ALCORN.
Dataset updated . Screening estimates derived from public data sources.