Datacenter Sites in ALCORN, Mississippi

ALCORN has 55 scored datacenter candidate sites averaging 50.2/100 DC Readiness, with a catalogued aggregate of 1,400 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

55
Candidate sites
50.2/100
Avg DC Readiness
1,400 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for ALCORN

Yessales_tax_exemption
Datacenter tax incentive
11.88¢/kWh
Commercial electricity
5.51¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$2,375
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

By site type

Top datacenter sites in ALCORN

Top datacenter sites in ALCORN
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN169436Substation-Adjacent161 kV100 MW1.4 yrs68.4
GLENSubstation-Adjacent161 kV100 MW1.4 yrs67.3
KOSSUTHSubstation-Adjacent161 kV100 MW1.4 yrs67.0
TAP154378Substation-Adjacent161 kV100 MW1.4 yrs66.7
TAP154382Substation-Adjacent161 kV100 MW1.4 yrs66.3
TAP154376Substation-Adjacent161 kV100 MW1.4 yrs65.4
KIMBERLY CLARKSubstation-Adjacent161 kV100 MW1.4 yrs65.4
UNKNOWN111023Substation-Adjacent161 kV100 MW1.4 yrs65.3
TAP169437Substation-Adjacent161 kV100 MW1.4 yrs64.7
UNKNOWN111022Substation-Adjacent161 kV100 MW1.4 yrs63.7
Greenfield (UNKNOWN111031 - TAP154398)Greenfield161 kV100 MW1.4 yrs60.6
OZ AlcornGreenfield1.4 yrs60.6
Greenfield (PICKWICK LANDING DAM - TAP1543)Greenfield161 kV100 MW1.4 yrs60.5
TAP154375Substation-Adjacent161 kV100 MW1.4 yrs59.7
Greenfield (TAP154375 - TAP154374)Greenfield161 kV100 MW1.4 yrs52.8
KIMBERLY-CLARK CORP. (TOILET PREPARATION MANUFACTURING)Manufacturing46.3
FCA MFG. CO. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING)Manufacturing46.3
KING MFG. CO., INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING)Manufacturing46.3
QUEBECOR WORLD, INC., CORINTH (OTHER COMMERCIAL PRINTING)Manufacturing46.3
APAC-MISSISSIPPI, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING)Manufacturing46.3
C & D JARNAGIN CO., INC. (ALL OTHER MISCELLANEOUS MANUFACTURING)Manufacturing46.3
HYDRAULIC ANALYSIS, INC. (FLUID POWER PUMP AND MOTOR MANUFACTURING)Manufacturing46.3
CM SOLUTIONS, INC. (NOT AVAILABLE)Manufacturing46.3
REFRESHMENTS, INC. (OTHER SNACK FOOD MANUFACTURING)Manufacturing46.3
CATERPILLAR, INC. (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING)Manufacturing46.3

ALCORN datacenter FAQ

How many datacenter sites are in ALCORN?
55 scored datacenter candidate sites, averaging 50.2/100 DC Readiness.
Does ALCORN offer datacenter tax incentives?
Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
What is the natural-hazard risk in ALCORN?
FEMA's National Risk Index rates ALCORN as "Relatively High" (score 45).
What are industrial electricity rates in ALCORN?
Average industrial electricity is 5.51¢/kWh and commercial is 11.88¢/kWh in ALCORN.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ALCORN, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.