Appeldorn Substation

Federal Excess

Yellow Medicine County, Minnesota · PJM

DC Readiness
48.1
Fair / 100

Appeldorn Substation is a federal excess datacenter candidate site in Yellow Medicine County, Minnesota, interconnecting through PJM. It screens at 48.1/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityMINNESOTA VALLEY COOP L&P ASSNcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPTierPoint Sioux Falls - East
IXP distance86.0 mi
Fiber providers6
Fiber coverage24.7%
Max download16 Mbps

Site characteristics

Acreage18 ac
Buildable load (est.)~7–18 MWland-based
Former usePower Development and Distribution

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterTierPoint Sioux Falls - East
DC distance86.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.79¢/kWh
Industrial electricity8.14¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$7,062

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 7 nearby

Get alerts

Track Appeldorn Substation

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
33
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
36
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Yellow Medicine County, ranked by DC Readiness.

Sites near Appeldorn Substation
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN170998Substation-Adjacent230 kV300 MW2.8 yrs58.6
UNKNOWN131973Substation-Adjacent115 kV100 MW2.8 yrs53.1
TAP158828Substation-Adjacent69 kV50 MW2.8 yrs52.4
UNKNOWN158830Substation-Adjacent69 kV50 MW2.8 yrs52.3
Granite Falls SubstationFederal Excess——3.8 yrs50.9
Mine SiteFormer Mine——2.8 yrs48.4
Mine SiteFormer Mine——2.8 yrs46.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Appeldorn Substation, Yellow Medicine County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.